Index Hall Replacement Project

Index Hall Replacement Project
Everett Community College, Everett, Washington
Completion Date: 2013
Building Total Area: 73,000 SF
Approximate Construction Cost: $26,000,000

Owner:
Everett Community College

A/E Team:
SRG Partnership, Inc. – Architect
Hargis Engineers – Electrical
Notkin Engineers – Mechanical

Construction Team:
Berschauer Phillips

Scope of Project:
The project consists of the design and construction of a new 73,000 sq ft facility to house the Nursing and Health Sciences programs at Everett Community College. The building includes spaces for classrooms, clinics, conference rooms, support space, computer labs, commons areas and an open atrium. The project is seeking LEED Gold Certification.

Services being Provided:
SMI Commissioning & Consulting, LLC is providing the Commissioning Authority services for this project, contracted by the Washington State Department of Enterprise Services. SMI is performing commissioning of HVAC systems, DDC control system, domestic water heating systems, and interior lighting controls. Services include development of commissioning specifications, conducting LEED reviews, preparing systems manuals, writing and performing functional performances testing, and preparation of the final commissioning report. The purpose of our services is to provide quality assurance of the mechanical, plumbing and electrical systems to ensure proper operation of the equipment per the design intent, energy code compliance and to help streamline the commissioning & construction process by assisting in the resolution of issues affecting the installation and functionality of equipment.